Settlement Shores Canal Maintenance Plan

In 2017 Council engaged Royal Haskoning DHV to produce an updated  Canal Management Plan (CMP) which included outlining the current condition of the canals, all maintenance works required, and an updated 10 year maintenance schedule for the canals.

As part of the CMP a hydrographic survey was conducted providing an accurate representation of the canal bed depth and shape. A comparison was made with the original design specifications and found that the current canal bed profile required dredging works. As part of Councils commitment to providing safe and effective assets for the community, dredging works are considered to be the priority maintenance activity as part of the comprehensive maintenance list produced from the 2017 CMP.

The CMP has identified that areas of the canal bed depths have been altered due to sedimentation, tidal movements, boat wash, etc and require cut and fill by dredging practices to provide sufficient depth for safe boat navigation. 

Settlement Shores Canal Maintenance Plan Report (2017)(PDF, 2MB)
Appendix A Field Data Collection Sheet and Plans Settlement Shores Canal Maintenance Plan(PDF, 22MB)
Appendix B Community Consultation Project Fact Sheet and Resident Survey Settlement Shores Canal Maintenance Plan(PDF, 561KB)
Appendix C Schedule of Properties Settlement Shores Canal Maintenance Plan(PDF, 368KB)
Appendix D Canal Maintenance Plan Spreadsheet Settlement Shores Canal Maintenance Plan(PDF, 2MB)
Appendix E Hydrographic Survey Plans Settlement Shores Canal Maintenance Plan(PDF, 18MB)
Appendix F Review of Environmental Factors Settlement Shores Canal Maintenance Plan(PDF, 16MB)
Appendix G Original Canal Design Drawings Settlement Shores Canal Maintenance Plan(PDF, 31MB)